Bridge Building 2016

Locked
JonB
Coach
Coach
Posts: 346
Joined: March 11th, 2014, 12:00 pm
Division: C
State: FL
Has thanked: 1 time
Been thanked: 21 times

Re: Bridge Building 2016

Post by JonB »

DumbTro wrote:
JonB wrote:
DumbTro wrote:Guys what's the best way to hair dry your structure while maintaining most strength and decreasing most weight for the bridge?
This has been discussed in the past and I am pretty sure that almost everyone agrees that using a hair dryer is just not practical in reference to removing moisture from the wood (also, you don't want to remove ALL the moisture). There is really no way to use a hair dryer right before you test your bridge. If you use a hair dryer hours before the competition then it will just reabsorb moisture from the air around it. We have used silica gel in the containers that we transport our structures in but that is just to make sure that there is not an EXCESS of moisture around it (we are in Florida).
What I'm trying to say I want to use a hairdryer because maybe its not the best method but it still removes weight from the structure from and increases my efficiency. I got an efficiency of 1724 with my bridge at 8.7 and I held max load. I removed 0.1 gram with hair drying, but I want to know a way that is better and makes me loss more weight. By the way I'm division C.

If you remove ALL of the moisture it can become very brittle. I would say there is a balance- you want SOME moisture in the wood. The only way that is "better" is to optimize the actual wood being used (use lighter wood in areas that can take it) and optimize the design.
nxtscholar
Member
Member
Posts: 261
Joined: November 14th, 2013, 6:25 pm
Division: Grad
State: NJ
Has thanked: 0
Been thanked: 0

Re: Bridge Building 2016

Post by nxtscholar »

If you really want more information, just go back to 2014 under the boomilever topic. As JonB stated, it was adequately addressed back then. Type in "dry" to see all the relevant posts about using a hair dryer to dehydrate your structure.

http://www.scioly.org/phpBB3/search.php ... sf=msgonly
noobforce
Member
Member
Posts: 70
Joined: March 14th, 2012, 3:13 pm
Division: C
State: NJ
Has thanked: 0
Been thanked: 0

Re: Bridge Building 2016

Post by noobforce »

Image

some sketchy setup for NJIT Regional in NJ... There wasn't even 15KG and we ran out of sand at 12KG...
User avatar
bernard
Administrator
Administrator
Posts: 2499
Joined: January 5th, 2014, 3:12 pm
Division: Grad
State: WA
Pronouns: He/Him/His
Has thanked: 186 times
Been thanked: 795 times
Contact:

Re: Bridge Building 2016

Post by bernard »

noobforce wrote:Image

some sketchy setup for NJIT Regional in NJ... There wasn't even 15KG and we ran out of sand at 12KG...
Calling nxtscholar to run all Bridge Building events in NJ...
"One of the ways that I believe people express their appreciation to the rest of humanity is to make something wonderful and put it out there." – Steve Jobs
JonB
Coach
Coach
Posts: 346
Joined: March 11th, 2014, 12:00 pm
Division: C
State: FL
Has thanked: 1 time
Been thanked: 21 times

Re: Bridge Building 2016

Post by JonB »

noobforce wrote:Image

some sketchy setup for NJIT Regional in NJ... There wasn't even 15KG and we ran out of sand at 12KG...

Wow. Just, wow.
nxtscholar
Member
Member
Posts: 261
Joined: November 14th, 2013, 6:25 pm
Division: Grad
State: NJ
Has thanked: 0
Been thanked: 0

Re: Bridge Building 2016

Post by nxtscholar »

@bernard: lolol thanks :P This actually made my day
retired1
Member
Member
Posts: 676
Joined: July 25th, 2012, 5:04 pm
Division: Grad
State: FL
Has thanked: 0
Been thanked: 0

Re: Bridge Building 2016

Post by retired1 »

I see 1 pair of safety glasses, but nobody wearing them. Are the pictures pre/during/post competition?
noobforce
Member
Member
Posts: 70
Joined: March 14th, 2012, 3:13 pm
Division: C
State: NJ
Has thanked: 0
Been thanked: 0

Re: Bridge Building 2016

Post by noobforce »

That was during the competition... It was a mess. The proctors broke the first scale so we were delayed 30 minutes to get a new one. When they massed the sand they didn't even include the mass of the chain and the scale itself (it was attached to the chain). Our efficiency could have been much much higher but there wasn't 15KG of sand to use. I actually wasn't expecting to do as well as I did but am very happy with my result.
JonB
Coach
Coach
Posts: 346
Joined: March 11th, 2014, 12:00 pm
Division: C
State: FL
Has thanked: 1 time
Been thanked: 21 times

Re: Bridge Building 2016

Post by JonB »

noobforce wrote:That was during the competition... It was a mess. The proctors broke the first scale so we were delayed 30 minutes to get a new one. When they massed the sand they didn't even include the mass of the chain and the scale itself (it was attached to the chain). Our efficiency could have been much much higher but there wasn't 15KG of sand to use. I actually wasn't expecting to do as well as I did but am very happy with my result.
How did you score? What were the top scores you saw?
nxtscholar
Member
Member
Posts: 261
Joined: November 14th, 2013, 6:25 pm
Division: Grad
State: NJ
Has thanked: 0
Been thanked: 0

Re: Bridge Building 2016

Post by nxtscholar »

I mean...they only had 12 kg of sand. :shock: Scores there would be meaningless because anyone can speculate that it would have been higher (but subjective to how much).

Unless the bridges were low mass...then we'd see some potentially impressive scores regardless.
Locked

Return to “Bridge Building B/C”

Who is online

Users browsing this forum: No registered users and 8 guests